York College
Higher EdNecessitated by the infiltration of ground water into the subbasement level of the Academic Core Building, OLA designed the relocation and replacement of existing electrical distribution equipment. Additionally, the project entailed the replacement and relocation of any electrical equipment and feeders impacted by the water infiltration.